Tahoma Transportation Center
| Owner | Tahoma School District |
|---|---|
| Location | Maple Valley, WA |
| Completed | October 2009 |
| Project Type | New Construction |
| Building Area | 13,138 SF |
| Cost | $2.4 M |
The Tahoma Transportation Center was divided into two phases. Phase I consisted of major site work including: site survey, erosion control, grading, storm management, septic and water systems, asphalt paving, security fencing, and electrical work. Phase II includes a maintenance building and separate dispatch building. The maintenance building is an engineered metal building which contains a bus wash system, parts shop, and maintenance bays for buses. The dispatch building includes a driver’s lounge, offices, and dispatch room, and is of wood frame construction.